During the third week of our South Side Branch renovation process, a painter scrapes and carefully prepares the ceiling for painting while electricians measure, remeasure and mark the floor to receive electrical wiring and outlets. The tan T-shaped strip on the ceiling is where the old HVAC ductwork was located and removed, now revealing decades old paint.